May 13

Wow so many things have happened since my last post. World events, Oil gushing in the ocean and BP doesn’t know how to stop it. How many golf balls will it take to stuff the leaky pipe? The winner receives gas for a lifetime!

Well for my projects, exciting progress, has keep me busy not to mention the phone ringing and meeting potential clients. It ’s great that the economy is changing and people are feeling comfortable with it. So what’s new on Beacon Hill (Sips project) this project is great, it is so quite in the house after the insulation and drywall was installed. This house is adjacent to the flight path of Boeing Field in Seattle. Big and small planes, even the new 777 has test flights from this landing strip, so imagine the noise some of these jets produce. So the house on Beacon Hill has the siding installed, the waterproof decking was applied, the exterior doors put into place and she’s all wrapped up. The interior will look great. The owner has picked out nice finished, with granite counter tops, tile heated floors for the bathrooms. The master shower, anyone would enjoy!

The Talk of the Neighborhood

Exterior Tyvek Installed

Wrap it, opps I forgot a bow!

Leave a Reply

preload preload preload